PNN DigitalPNN Digital
    Facebook Twitter Instagram
    Thursday, August 7
    Trending
    • Oben Electric Launches Next-Gen Rorr EZ Sigma at an Introductory Price of Rs 1.27 Lakh
    • A Rare Double for India’s Shipping – 2 Big Laws Cleared in a Single Day
    • Keashnagar Bengali Association Brings Durga Puja Festivities to Keshavnagar
    • Steel Exchange India Limited Announces Strategic Collaboration to Strengthen Multimodal Logistics Capabilities in Vizag
    • Bombay Industries Association Indoor Tournament 2025 Blends Sportsmanship with Networking
    • Connplex Cinemas Limited IPO Opens on August 07, 2025
    • World Sanskrit Day: 15 Years of Ink, Intention, and India’s Oldest Voice
    • Technoflex Steel India Pvt Ltd Expands Footprint with New State-of-the-Art Manufacturing Facility in SEZ Pithampur, Madhya Pradesh
    Submit News
    PNN DigitalPNN Digital
    Subscribe
    • Home
    • News
    • Business
    • Entertainment
    • National
    • Lifestyle
    • More
      • Sports
      • Health
      • Finance
      • Education
    PNN DigitalPNN Digital
    Home»National

    Citizens of Malad will get a new 60 feet wide road Malad will get relief from traffic and water logging problems

    PNN NewsdeskPNN NewsdeskUpdated:06/08/2025 National 2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Mumbai (Maharashtra) [India], August 6:  The good news for the citizens of Malad is that by the end of this year, a new 60-foot-wide and 550-meter-long road is going to be available, which has been named the Shankar Lane Missing Link Project. This new road will directly connect the Malad Shankar Line to the Malad Link Road near Valnai Metro Station.

    Municipal Corporation Mumbai, P/North Ward, has started working on this project rapidly to reduce the traffic problem here. Assistant Municipal Commissioner of P/North Kundan Valvi said that with the construction of this road, an alternative route will be created to go from Malavani, Jan Kalyan Nagar and Lalji Pada to Western Express Highway. This project will also reduce the traffic pressure on areas like Marve Road, Malad Sub-way, and people will get relief. Along with this, the problem of waterlogging in the Sapur Pada area during the rainy season will also be solved to a great extent.

     

    P/North Executive Engineer Mandar Chaudhary informed that this project will be completed in three phases. For this, a total of 357 houses are to be demolished, out of which 110 huts have been demolished so far. The rest of the work is also going on at a fast pace. The people whose huts have been demolished have been shifted to Seraj Guriapada SRA, New Link Road, Malad (West). While giving information about this project, Dr. Bhagyashree Kapse, Deputy Commissioner of Municipal Corporation of Zone 4, assured that this road will be completely ready in the next 3 to 4 months. Her team is working very hard so that Malad can get this new road before time.

    If you object to the content of this press release, please notify us at [email protected]. We will respond and rectify the situation within 24 hours

    PNN Newsdesk

    Keep Reading

    Oben Electric Launches Next-Gen Rorr EZ Sigma at an Introductory Price of Rs 1.27 Lakh

    A Rare Double for India’s Shipping – 2 Big Laws Cleared in a Single Day

    Keashnagar Bengali Association Brings Durga Puja Festivities to Keshavnagar

    Steel Exchange India Limited Announces Strategic Collaboration to Strengthen Multimodal Logistics Capabilities in Vizag

    Bombay Industries Association Indoor Tournament 2025 Blends Sportsmanship with Networking

    Connplex Cinemas Limited IPO Opens on August 07, 2025

    Recent Posts
    • Oben Electric Launches Next-Gen Rorr EZ Sigma at an Introductory Price of Rs 1.27 Lakh
    • A Rare Double for India’s Shipping – 2 Big Laws Cleared in a Single Day
    • Keashnagar Bengali Association Brings Durga Puja Festivities to Keshavnagar
    • Steel Exchange India Limited Announces Strategic Collaboration to Strengthen Multimodal Logistics Capabilities in Vizag
    • Bombay Industries Association Indoor Tournament 2025 Blends Sportsmanship with Networking

    Oben Electric Launches Next-Gen Rorr EZ Sigma at an Introductory Price of Rs 1.27 Lakh

    06/08/2025

    A Rare Double for India’s Shipping – 2 Big Laws Cleared in a Single Day

    06/08/2025

    Keashnagar Bengali Association Brings Durga Puja Festivities to Keshavnagar

    06/08/2025

    Steel Exchange India Limited Announces Strategic Collaboration to Strengthen Multimodal Logistics Capabilities in Vizag

    06/08/2025

    Bombay Industries Association Indoor Tournament 2025 Blends Sportsmanship with Networking

    06/08/2025

    Connplex Cinemas Limited IPO Opens on August 07, 2025

    06/08/2025
    Facebook Instagram Twitter
    • Legal Disclaimer
    • Privacy Policy
    • Contact Us
    • About Us
    © 2025 PNN Digital. Designed by Primex Media Services.

    Type above and press Enter to search. Press Esc to cancel.